Portfolio

Building the Electric Future
Across the Southeast

Mitchell Project Management Group delivers high-power electrical infrastructure across Georgia, Tennessee, South Carolina, and Alabama. Our portfolio spans DC fast charging networks, commercial charging installations, and industrial electrical coordination.

The following projects demonstrate our technical capability and execution discipline. All project details are anonymized to protect client confidentiality.

We coordinate electrical infrastructure that powers the next generation of energy distribution. From 350kW ultra-fast chargers serving highway corridors to multi-megawatt data center power distribution, we manage complexity across engineering, construction, and operations.

Case Studies

Project Results

Multi-Site DCFC Network
Regional DC Fast Charging Network Deployment
Charge Point Operator (CPO) | Southeast Regional Network
6
months to energization
The Challenge

CPO expanding into Southeast markets needed coordinated deployment of DC fast charging sites across three states. Project required utility incentive capture across multiple utility territories, equipment standardization for operational efficiency, and simultaneous site development to meet market entry timeline.

No established relationships with regional utilities. Limited engineering resources for multi-state permitting. Aggressive timeline to capture market share before competitors.

Our Approach
  • Developed standardized site assessment protocol across Georgia Power, TVA, and Duke Energy territories
  • Coordinated utility rebate applications simultaneously across all three utility providers
  • Selected equipment manufacturer providing consistent platform across all sites
  • Established relationships with regional electrical contractors in each market
  • Created project tracking system managing 8 simultaneous site developments
  • Provided weekly consolidated status reporting across entire portfolio
  • Managed engineering coordination for site-specific electrical designs
Technical Scope
8 DCFC sites 150-350kW per site Mixed CCS + NACS Networked management GA | TN | SC coverage Multi-state permitting
Results Delivered
8 DCFC sites energized across GA, TN, SC within 6-month deployment window
$380,000 in combined utility rebates secured across all utility territories
40% reduction in operational training costs from equipment standardization
Zero site delays from permitting or utility interconnection issues
CPO achieved planned market entry timeline and competitive positioning
Established foundation for ongoing network expansion
Public DCFC Corridor Infrastructure
Interstate Highway Charging Corridor Development
Travel Center Chain | Regional Highway Network
5
months to customer launch
The Challenge

National travel center brand deploying EV charging infrastructure along major interstate corridors needed fast project delivery to meet corporate sustainability commitments. Required high-power charging capability, integration with existing facilities, and brand-consistent customer experience.

Complex site electrical requirements due to existing facility loads. Utility service upgrades needed at multiple locations. Corporate stakeholder coordination across real estate, operations, and sustainability teams.

Our Approach
  • Conducted electrical capacity assessment across 12 candidate locations
  • Prioritized sites based on utility service availability and upgrade costs
  • Coordinated Georgia Power and Alabama Power rebate applications
  • Managed utility service upgrade requirements and timeline
  • Selected 350kW ultra-fast charging equipment for premium customer experience
  • Integrated charging infrastructure with existing facility electrical and payment systems
  • Managed construction coordination to minimize disruption to existing operations
Technical Scope
6 highway corridor sites 350kW per site CCS + NACS connectors Utility upgrades at 4 sites I-20 + I-85 corridors Payment system integration
Results Delivered
6 ultra-fast charging sites along I-20 and I-85 corridors
350kW charging capability attracting premium EV segment (Porsche, Tesla, Lucid)
$240,000 in Georgia Power and Alabama Power rebates captured
Zero operational disruption during construction and installation
Brand-consistent customer experience across all locations
Featured in corporate sustainability reporting and marketing
Class A Office Building EV Infrastructure
Urban Commercial Property Charging Amenity
Commercial Real Estate Developer | Premium Office Property
4
months to energization
The Challenge

Developer constructing Class A office building in urban market needed tenant amenity charging to compete for premium corporate tenants. Required mix of Level 2 workplace charging and DC fast charging for tenant fleets and visitors. Project timeline aligned with building certificate of occupancy.

Complex coordination with building electrical design team. Parking garage integration requirements. Tenant pre-leasing timeline pressure. Multiple stakeholder approval processes.

Our Approach
  • Coordinated with electrical engineering firm during building design phase
  • Integrated charging infrastructure into garage electrical distribution design
  • Secured Georgia Power Make Ready rebate for full project
  • Selected equipment providing tenant usage reporting and billing capability
  • Managed installation coordination with general contractor schedule
  • Provided tenant leasing team with charging infrastructure marketing materials
  • Coordinated energization with building certificate of occupancy timeline
Technical Scope
24 Level 2 ports (7.2-11.5kW) 4 DCFC ports (50kW) Networked + tenant billing Access control integration LEED documentation
Results Delivered
24 Level 2 workplace charging spaces operational
4 DC fast charging spaces for tenant fleets
$95,000 Georgia Power Make Ready rebate captured
Two anchor tenants cited charging access as lease decision factor
Building achieved LEED points for EV infrastructure
Property positioned as premium sustainable workplace
Fleet Depot DCFC Installation
Municipal Fleet Depot Charging Infrastructure
Municipal Government | Fleet Electrification Initiative
7
months to fleet transition
The Challenge

City government transitioning vehicle fleet to electric needed depot charging infrastructure supporting overnight Level 2 charging and opportunity DC fast charging. Limited capital budget requiring maximum utility rebate capture. Public sector procurement and approval requirements.

Complex utility interconnection due to existing facility load. Limited in-house technical expertise for EV infrastructure. Public bidding requirements for contractor selection. Political timeline pressure for sustainability goal demonstration.

Our Approach
  • Conducted fleet charging needs assessment and usage modeling
  • Designed mixed Level 2 and DCFC solution optimizing cost and functionality
  • Navigated TVA incentive programs for maximum rebate eligibility
  • Prepared public procurement documents meeting municipal requirements
  • Provided technical evaluation criteria for contractor bid assessment
  • Managed community engagement and stakeholder communications
  • Coordinated installation around fleet operational requirements
Technical Scope
15 Level 2 networked ports 5 DCFC ports (50kW) Fleet management integration Demand management Public procurement compliance
Results Delivered
Infrastructure supporting 35 fleet vehicle transition (police, public works, administration)
$175,000 in TVA rebate funding captured (72% of infrastructure cost)
Zero fleet operational disruption during installation
Municipal sustainability goals achieved two years ahead of schedule
Model program referenced by regional municipalities
Luxury Apartment Complex EV Amenity
Multifamily Residential Charging Program
Multifamily Developer | Class A Residential Property
3
months to resident availability
The Challenge

Luxury apartment developer targeting young professional demographic needed resident charging amenity meeting high-end expectations. Required scalable infrastructure accommodating future growth. Resident billing and access management complexity. Property management operational integration.

Limited electrical service capacity requiring strategic deployment approach. Resident expectation management during phased rollout. HOA and property management approval processes. Competitive market requiring fast deployment timeline.

Our Approach
  • Designed phased deployment approach matching resident adoption curve
  • Prioritized high-demand parking locations for initial installation
  • Coordinated Duke Energy rebate application for infrastructure support
  • Selected equipment providing resident billing and access management
  • Integrated charging management with property management systems
  • Created resident communication materials and enrollment process
  • Managed installation minimizing disruption to existing residents
Technical Scope
20 Level 2 ports (Phase 1) 70-port planned buildout Resident billing integration Property mgmt integration Duke Energy coordination
Results Delivered
Phase 1: 20 Level 2 charging spaces operational
Scalable infrastructure supporting 50+ additional spaces in future phases
$85,000 Duke Energy rebate captured
100% resident satisfaction rating in post-installation survey
Property achieved 8% rent premium vs. comparable properties without charging
Developer expanding program to entire portfolio based on success
Technical Delivery

Proven Technical Capabilities

Electrical Power Coordination

  • 50kW to 350kW+ DC fast charging
  • Multi-megawatt utility service coordination
  • Transformer and switchgear specifications
  • Generator and backup power integration
  • Demand management and load balancing

Geographic Coverage

  • Projects delivered across GA, TN, SC, AL
  • Urban, suburban, rural, and highway corridor locations
  • Multiple utility territory experience
  • Regional permitting and compliance expertise

Equipment Platforms

  • ChargePoint Express Plus and CPE series
  • ABB Terra high-power charging family
  • Tritium RTM and PKM platforms
  • Siemens VersiCharge and Sicharge systems
  • BTC Power high-power solutions
  • FreeWire battery-integrated chargers

Utility Programs

  • Georgia Power Make Ready program navigation
  • Tennessee Valley Authority EV incentives
  • Duke Energy commercial charging rebates
  • Alabama Power infrastructure programs
  • Multi-utility project coordination

Project Types

  • Public charging corridor development
  • Commercial property tenant amenities
  • Multifamily residential charging programs
  • Fleet depot charging infrastructure
  • Workplace employee charging
  • Destination and hospitality charging
Markets

Markets We Serve

Charge Point Operators

  • Network deployment and expansion
  • Site development and optimization
  • Equipment standardization
  • Operational efficiency planning

Commercial Real Estate

  • Office building tenant amenities
  • Retail and shopping center installations
  • Mixed-use development charging
  • Property value enhancement

Multifamily Residential

  • Luxury apartment charging programs
  • Resident billing and management
  • Scalable infrastructure design
  • Property competitive positioning

Fleet Operations

  • Municipal fleet electrification
  • Delivery and logistics charging
  • Service vehicle infrastructure
  • Corporate fleet transition

Hospitality & Destination

  • Hotel and resort charging amenities
  • Entertainment venue installations
  • Tourism destination infrastructure
  • Customer experience integration

Travel & Convenience

  • Highway corridor charging
  • Travel center infrastructure
  • Convenience store installations
  • Interstate corridor coverage
Client Outcomes

What Our Clients Say

"Mitchell PM Group delivered our entire Southeast charging network on schedule and within budget. The utility rebate capture alone paid for the project management investment. Professional execution across every site."

Regional CPO, Multi-State DCFC Network

"Tysha coordinated our building charging infrastructure seamlessly with our construction schedule. Two anchor tenants specifically cited EV charging access in their lease decisions. The amenity pays for itself in rent premium."

Commercial Developer, Class A Office Building

"We had zero experience with DC fast charging before this project. Mitchell PM Group provided the technical expertise and utility coordination we lacked internally. Our highway locations now attract premium EV customers."

Operations Director, Travel Center Chain

"The phased deployment approach was brilliant. We launched resident charging without overbuilding infrastructure. Resident satisfaction is 100% and we are expanding to our entire portfolio based on this success."

Multifamily Developer, Luxury Residential

Note: Testimonials represent typical client outcomes. Actual testimonials available upon request.